150 bhp condensing boilers price

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :150 bhp condensing boilers price
  • Supply Capacity : 10 units/month :150 bhp condensing boilers price
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • .vasai.icai.org

    A. Specialised boilers and furnaces: (a) Ignifluid/fluidized bed boilers (b) Flameless furnaces and continuous pusher type furnaces (c) Fluidized bed type heat treatment furnaces (d) High efficiency boilers (thermal efficiency higher than75 per cent in case of coal fired and 80 per cent in case of oil/gas fired boilers) 40Get Price

  • Chapter 4: [CE] Commercial Energy Efficiency, Energy

    These requirements apply to boilers with rated input of 8,000,000 Btu/h or less that are not packaged boilers and to all packaged boilers. Minimum efficiency requirements for boilers cover all capacities of packaged boilers. Maximum capacity — minimum and maximum ratings as provided for and allowed by the unit's controls.Get Price

  • PIPE ALBORBOR RAINBOW BOOK (CP) | PDF | Heat | Heat Transfer

    A Two boilers are operating steadily on 91,000 kg of coal contained in a bunker. One boiler is producing 1591 kg of steam per hour at 1.2 factor of evaporation and an efficiency of 65% and another boiler produced 1364 kg of steam per hour and 1.15 factor of evaporation and an efficiency of 60%.Get Price

  • Chapter 4: [CE] Commercial Energy Efficiency, Energy

    These requirements apply to boilers with rated input of 8,000,000 Btu/h or less that are not packaged boilers and to all packaged boilers. Minimum efficiency requirements for boilers cover all capacities of packaged boilers. Maximum capacity — minimum and maximum ratings as provided for and allowed by the unit's controls.Get Price

  • Chapter 4: [CE] Commercial Energy Efficiency, Energy

    These requirements apply to boilers with rated input of 8,000,000 Btu/h or less that are not packaged boilers and to all packaged boilers. Minimum efficiency requirements for boilers cover all capacities of packaged boilers. Maximum capacity — minimum and maximum ratings as provided for and allowed by the unit's controls.Get Price

  • PIPE ALBORBOR RAINBOW BOOK (CP) | PDF | Heat | Heat Transfer

    A Two boilers are operating steadily on 91,000 kg of coal contained in a bunker. One boiler is producing 1591 kg of steam per hour at 1.2 factor of evaporation and an efficiency of 65% and another boiler produced 1364 kg of steam per hour and 1.15 factor of evaporation and an efficiency of 60%.Get Price

  • PIPE ALBORBOR RAINBOW BOOK (CP) | PDF | Heat | Heat Transfer

    A Two boilers are operating steadily on 91,000 kg of coal contained in a bunker. One boiler is producing 1591 kg of steam per hour at 1.2 factor of evaporation and an efficiency of 65% and another boiler produced 1364 kg of steam per hour and 1.15 factor of evaporation and an efficiency of 60%.Get Price