combined heavy oil fired fire tube steam boiler for sale in north america
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
Six Yarrow oil-fired water tube boilers supplied steam at 425 lb/psi and 725 degrees superheat. The main engines developed 30,000 shp on five boilers (leaving one in reserve) for a normal service speed of 21 knots.Get Price
Six Yarrow oil-fired water tube boilers supplied steam at 425 lb/psi and 725 degrees superheat. The main engines developed 30,000 shp on five boilers (leaving one in reserve) for a normal service speed of 21 knots.Get Price
The "Wacht am Rhein VII" was built in 1893 as a Rhein tug by the P. Boele Shipyard at Slikkerveer in Holland. She was a tug powered by a coal fired boiler, a compound engine developing 300 IHP and was designed specially for the middle part of the river Rhein which has lots of bends and very strong currents.Get Price
Dec 21, 2021 · To achieve the planned 35-knot speed the designers opted for a total of 12 water-tube boilers feeding into 4 geared steam turbines, generating a potential of 280,000 shaft horse power. The machinery would have been organized into an alternating configuration of boiler rooms and turbine rooms, with each boiler and turbine room housing three Get Price
The "Wacht am Rhein VII" was built in 1893 as a Rhein tug by the P. Boele Shipyard at Slikkerveer in Holland. She was a tug powered by a coal fired boiler, a compound engine developing 300 IHP and was designed specially for the middle part of the river Rhein which has lots of bends and very strong currents.Get Price
Dec 21, 2021 · To achieve the planned 35-knot speed the designers opted for a total of 12 water-tube boilers feeding into 4 geared steam turbines, generating a potential of 280,000 shaft horse power. The machinery would have been organized into an alternating configuration of boiler rooms and turbine rooms, with each boiler and turbine room housing three Get Price